PROGETTI REALIZZATI ED IN CORSO

MATER DEI HOSPITAL, LA VALLETTA, MALTA


AMMODERNAMENTO DI:

17 ASCENSORI IDRAULICI
36 ASCENSORI A FUNE
2 SCALE MOBILI


MODERNIZATION OF:

 17 HYDRAULIC LIFTS 
36 ROPE LIFTS 
2 ESCALATORS


M/N MSC LIRICA


SERVICE IN BRASILE ED ARGENTINA


SERVICE AT SEA


EDISON, PONTREMOLI

SOSTITUZIONE FUNI DI TRAZIONE IMPIANTO IN GALLERIA

REPLACEMENT OF THE TRACTION ROPES OF THE SYSTEM IN THE TUNNEL




MARTIN PIAGGIO, GENOVA

SOSTITUZIONE INTEGRALE DUE ASCENSORI.

INTEGRAL REPLACEMENT TWO LIFT 


STAZIONE BRIGNOLE METROPOLITANA DI GENOVA


MANUTENZIONE STRAORDINARIA SEI SCALE MOBILI

EXTRAORDINARY MAINTENANCE SIX ESCALATORS

MANUTENZIONE STRAORDINARIA NOVE ASCENSORI


M/N HAL ROTTERDAM


SERVICE INGHILTERRA IRLANDA


SERVICE AT SEA



PUNTO VENDITA LIDL, SA VENERA, MALTA


INSTALLAZIONE DUE NUOVI IMPIANTI


INSTALLATION OF TWO NEW ELEVATORS




CANTORE, GENOVA

SMONTAGGIO COMPLETO  IMPIANTI NOVE FERMATE

COMPLETE DISASSEMBLY LIFTS NINE STOPS


OSPEDALE CELESIA, GENOVA


SOSTITUZIONE INTEGRALE MONTALETTIGHE 2000 KG.

INTEGRAL REPLACEMENT LIFT 2000 KG


"SEABOURN VENTURE", GROENLANDIA


SERVICE IN NAVIGAZIONE

SERVICE AT SEA



NH HOTEL, GENOVA


SOSTITUZIONE ARGANO DI TRAZIONE

TRACTION WINCH REPLACEMENT



M.Y. SERENE, MUGGIANO


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


ESSELUNGA , GENOVA


SOSTITUZIONE INVERTER E PARTE ELETTRICA SCALA MOBILE

REPLACEMENT OF THE INVERTER AND ELECTRICAL PART OF THE SCALE SCALE





VIA PUGGIA, GENOVA


MONTAGGIO NUOVO IMPIANTO 


ASSEMBLY OF NEW PLANT 


M/N VASCO DA GAMA


DRY DOCK SETUBAL, PORTOGALLO


WORKING AT DRY DOCK



VIA PAGGI, SESTRI LEVANTE


SMONTAGGIO COMPLETO DUE IMPIANTI 


COMPLETE DISASSEMBLY TWO LIFTS 


TORRE MSC, GENOVA


SOSTITUZIONE ARGANI DI SOLLEVAMENTO MRL


LIFTING MRL WINCH REPLACEMENT



PALAZZO DELLA BORSA VALORI DI GENOVA 


SOSTITUZIONE INTEGRALE ASCENSORE E VANO CORSA IN CRISTALLO

COMPLETE REPLACEMENT OF THE ELEVATOR AND GLASS LINE


SAN LORENZO, COGOLETO, GENOVA


AMMODERNAMENTO IMPIANTO

REPLACEMENT



"EXPLORA 1", GRECIA


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


PIAZZA CARICAMENTO, GENOVA


SOSTITUZIONE QUARANTADUE PORTE DI PIANO. E OPERATORI PORTA

FORTY-TWO FLOOR DOORS REPLACEMENT. AND DOOR OPERATORS


UNIVERSITA' DI GENOVA


SOSTITUZIONE INTEGRALE ASCENSORE E VANO CORSA IN CRISTALLO

COMPLETE REPLACEMENT OF THE ELEVATOR AND GLASS LINE


"THE PLAZA COMMERCIAL CENTRE", SLIEMA


MODERNIZZAZIONE SETTE SCALE MOBILI E MANUTENZIONE STRAORDINARIA

SEVEN ESCALATOR MODERNIZATION END EXTRAORDINARY MAINTENANCE


VILLINI ROLLINO, GENOVA


MONTAGGIO NUOVO IMPIANTO COMPRESO DI CASTELLO VETRATO


ASSEMBLY OF NEW PLANT INCLUDING GLASS CASTLE


OSPEDALE SAN MARTINO


AMMODERNAMENTO SETTE IMPIANTI MONTALETTIGHE 

MODERNIZATION OF SEVEN LITTLE ASSEMBLY PLANTS



"MSC FANTASIA", MEDITERRANEO


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


EX MERCATO DEL PESCE, GENOVA


POSA IN OPERA NUOVA SCALA MOBILE

INSTALLATION OF A NEW MOBILE LADDER


ESSELUNGA GENOVA


POSA IN OPERA DUE NUOVE SCALE MOBILI

MONTAGGIO ASCENSORE PUBBLICO


INSTALLATION OF TWO NEW ESCALATORS 

PUBLIC ELEVATOR ASSEMBLY


GRATTACIELO ABBO, IMPERIA


SOSTITUZIONE FUNI DI TRAZIONE VENTI FERMATE, SOSTITUZIONE QUADRI DI MANOVRA

REPLACEMENT OF TRACTION ROPES TWENTY STOPS, REPLACEMENT OF CONTROL PANEL



GRATTACIELO SAN CAMILLO


MANUTENZIONE STRAORDINARIA ARGANO DI TRAZIONE, SOSTITUZIONE FUNI DI TRAZIONE

EXTRAORDINARY MAINTENANCE DRIVE WINCH, TRACTION ROPES REPLACEMENT



STAR HOTEL PRESIDENT, GENOVA


MANUTENZIONE STRAORDINARIA

EXTRAORDINARY MAINTENANCE


NUOVO PUNTO VENDITA LIDL, IMPERIA


INSTALLAZIONE DUE TAPPETI MOBILI 24 METRI

INSTALLATION OF TWO MOBILE CARPETS 24 METERS 


M.Y. APOGEE


MANUTENZIONE STRAORDINARIA

EXTRAORDINARY MAINTENANCE



CEMENTIFICIO BUZZI, ROBILANTE CUNEO


SMONTAGGIO PER SOSTITUZIONE MONTACARICHI 3000 KG 60 METRI DI CORSA

DISASSEMBLY FOR REPLACEMENT OF FOOD LIFT 3000 KG 60 METERS OF RUN



PORTOFINO


AMMODERNAMENTO IMPIANTO IN GROTTA NOVANTA METRI DI CORSA

SYSTEM MODERNIZATION IN THE CAVE NINETY METERS OF RUN


MEGA SMERALDA, TUNISIA


SOSTITUZIONE CATENE TRASCINAMENTO TAPPETI MOBILI

REPLACEMENT OF DRIVING CHAINS OF THE MOBILE CARPET


VIA ROBINO, GENOVA


RIFACIMENTO ASCENSORE

LIFT REFURBISHMENT



SILVERSEA "SHADOW", ALASKA


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


GT MOTOR GENOVA


SOSTITUZIONE FUNI DI TRAZIONE SU DUE MONTACARICHI SPECIALI E MODIFICA CORSA IMPIANTI

REPLACEMENT OF THE TRACTION ROPES ON TWO SPECIAL GOODS LIFTS AND MODIFICATION OF THE SYSTEM STROKE


STAZIONE METROPOLITANA DI GENOVA


SOSTITUZIONE COMPLETA SCALA MOBILE 19 METRI

REPLACEMENT OF THE ESCALATOR 19 METERS 


MSC PREZIOSA, MALTA


LAVORAZIONI IN BACINO DI CARENAGGIO

WORKING AT DRY DOCK




STAZIONE CENTRALE, MILANO


MONTAGGIO ASCENSORE CIRCOLARE E STRUTTURA IN CRISTALLO


ASSEMBLY OF CIRCULAR ELEVATOR AND GLASS STRUCTURE


TORRE ELAH, GENOVA


MANUTENZIONE STRAORDINARIA

EXTRAORDINARY MAINTENANCE



VILLA CRISPI, SORI, GENOVA


SMONTAGGIO PARZIALE IMPIANTO

PARTIAL SISTEM DISASSEMBLY


MSC ORCHESTRA, MEDITERRANEO


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


TORRE SAN CAMILLO, GENOVA


SOSTITUZIONE FUNI DI TRAZIONE


REPLACEMENT OF TRACTION ROPES




IKARUS PALACE


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


WORLD TRADE CENTER, GENOVA


MANUTENZIONE STRAORDINARIA, SOSTITUZIONE FUNI DI TRAZIONE OTTO IMPIANTI 

EXTRAORDINARY MAINTENANCE, REPLACEMENT OF TRACTION ROPES FOR EIGHT ELEVATORS





TRAGHETTO GNL "GALEOTTA"


COMPLETAMENTO MONTAGGIO

ASSEMBLY COMPLETION


TORRE SHIPPING, GENOVA


MANUTENZIONE STRAORDINARIA ARGANI DI SOLLEVAMENTO

EXTRAORDINARY MAINTENANCE LIFTING WINCH



VIA GENOVA 16 RIVA TRIGOSO


SMONTAGGIO COMPLETO 

COMPLETE DISASSEMBLY 



COSTA FORTUNA, MARSIGLIA


LAVORAZIONI IN BACINO DI CARENAGGIO

WORKING AT DRY DOCK


PARCHEGGIO MULTIPIANO CORTE LAMBRUSCHINI, GENOVA


AMMODERNAMENTO CINQUE ASCENSORI

MODERNIZATION OF FIVE ELEVATORS


NUOVA STAZIONE FERROVIARIA, IMPERIA


INSTALLAZIONE DUE NUOVI ASCENSORI

INSTALLATION OF TWO NEW ELEVATORS



SEABOURN ODYSSEY


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


PALAZZO DI GIUSTIZIA DI GENOVA

AMMODERNAMENTO COMPLETO CINQUE ASCENSORI


COMPLETE MODERNIZATION OF FIVE ELEVATORS



CENTRO COMMERCIALE FIUMARA, GENOVA


MANUTENZIONE STRAORDINARIA SCALE MOBILI


EXTRAORDINARY MAINTENANCE ESCALATOR




GRAND PRINCESS, U.S.A.


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


SEDE TELEVISIVA PRIMOCANALE, GENOVA


MONTAGGIO NUOVO IMPIANTO VELOCITA' OTTO M/S


ASSEMBLY OF NEW PLANT 


MAGNAGHI, GENOVA


SMONTAGGIO IMPIANTO ASCENSORE


LIFT SYSTEM DISASSEMBLY




CARNIVAL VISTA, U.S.A.


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


OSPEDALE GALLIERA


SOSTITUZIONE PORTE TAGLIAFUOCO DUE IMPIANTI


REPLACING FIRE DOORS TWO ELEVATORS



COOP VALBISAGNO, GENOVA


MODERNIZZAZIONE DUE SCALE MOBILI E MANUTENZIONE STRAORDINARIA

TWO ESCALATOR MODERNIZATION END EXTRAORDINARY MAINTENANCE


TORRE SHIPPING, GENOVA


MANUTENZIONE STRAORDINARIA ASCENSORE

EXTRAORDINARY MAINTENANCE ELEVATOR


SEDE FERRERO, ALBA


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


MSC POESIA


LAVORAZIONI IN BACINO DI CARENAGGIO, MALTA

WORKING AT DRY DOCK



TORRE SAN CAMILLO

SOSTITUZIONE SEI IMPIANTI IN BATTERIA COMPLETI

REPLACEMENT OF SIX COMPLETE BATTERY SYSTEMS 



NEURUS ROMANTIC, GOLFO PERSICO


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


ESSELUNGA, LA SPEZIA


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS



GRANDE NIGERIA, VALENCIA


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


NUOVO PUNTO VENDITA COOP,            

SANTA MARGHERITA 


INSTALLAZIONE MONTACARICHI IDRAULICO 3300 KG

INSTALLATION OF HYDRAULIC LOAD LIFT 3300 KG


PORTAEREI CAVOUR, MUGGIANO

LAVORAZIONI IN BACINO DI CARENAGGIO

WORKING AT DRY DOCK


NUOVO PUNTO VENDITA EUROSPIN CERIALE, SAVONA


INSTALLAZIONE DUE TAPPETI MOBILI 19 METRI

INSTALLATION OF TWO MOBILE CARPETS 19 METERS



M.Y. TE MANU, MONTECARLO


MANUTENZIONE STRAORDINARIA

EXTRAORDINARY MAINTENANCE


STAZIONE METROPOLITANA GENOVA BRIGNOLE


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS



MSC MUSICA, MARSIGLIA


LAVORAZIONI IN BACINO DI CARENAGGIO

WORKING AT DRY DOCK


CENTRO COMMERCIALE FIUMARA, GENOVA


SMONTAGGIO PER SOSTITUZIONE QUATTRO SCALE MOBILI 

DISASSEMBLY FOR REPLACEMENT OF FOUR ESCALATORS 



SEDE CA.RI.GE, GENOVA


SOSTITUZIONE CINQUE ARGANI DI TRAZIONE


REPLACEMENT OF FIVE TRACTION WINCHES



STAZIONE FERROVIARIA GENOVA PIAZZA PRINCIPE 


SMONTAGGIO E SOSTITUZIONE DUE SCALE MOBILI

DISASSEMBLY AND REPLACEMENT OF TWO ESCALATORS 


CANTIERE COSMO, GENOVA


SMONTAGGIO COMPLETO IMPIANTI NOVE FERMATE

COMPLETE DISASSEMBLY LIFTS NINE STOPS


IL MOLO, SAVONA


SOSTITUZIONE ARGANO DI TRAZIONE SCALA MOBILE


REPLACEMENT OF THE ESCALATOR TRACTION DRIVE


PARCHEGGIO "LE STREGHE" GENOVA NERVI 


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS



FINCANTIERI RIVA TRIGOSO


MONTAGGIO DI TUTTI I NUOVI CINQUE IMPIANTI A PROGETTO

INSTALLATION OF ALL FIVE NEW PROJECT SYSTEMS


CANTINE LUNAE, CASTELNUOVO MAGRA,            

LA SPEZIA


INSTALLAZIONE NUOVO IMPIANTO 2500 KG

INSTALLATION OF NEW ELEVATOR 2500 KG



MSC ARMONIA, MIAMI


LAVORAZIONI IN BACINO DI CARENAGGIO

WORKING AT DRY DOCK


CONDOMINIO "TORRE SAN VINCENZO" GENOVA


SOSTITUZIONE ARGANO TRAZIONE E MANUTENZIONE STRAORDINARIA 

TRACTION WINCH REPLACEMENT AND EXTRAORDINARY MAINTENANCE 


OSPEDALE SAN MARTINO GENOVA


AMMODERNAMENTO SETTE ASCENSORI 


MODERNIZATION OF SEVEN ELEVATORS




STAZIONE FERROVIARIA SESTRI PONENTE, GENOVA


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


CENTRO COMMERCIALE THE MALL, SANREMO


POSA IN OPERA NUOVA SCALA MOBILE

INSTALLATION OF A NEW MOBILE LADDER


CONDOMINIO "IL MATITONE" GENOVA


MANUTENZIONE STRAORDINARIA ARGANO DI TRAZIONE

EXTRAORDINARY MAINTENANCE DRIVE WINCH


CONDOMINIO STELLA, VARAZZE


RIFACIMENTO TOTALE ASCENSORE


TOTAL LIFT REFURBISHMENT





COMPLESSO ERZELLI GENOVA


INSTALLAZIONE SISTEMA PORT


PORT SYSTEM INSTALLATION



H&M SAVONA 


SOSTITUZIONE ARGANO DI TRAZIONE SCALA MOBILE


REPLACEMENT OF THE ESCALATOR TRACTION DRIVE


"IL MATITONE"


SOSTITUZIONE INTEGRALE PARTE ELETTRICA OTTO ASCENSORI

COMPLETE REPLACEMENT OF THE ELECTRICAL PART OF EIGHT ELEVATORS 




LIRI, GENOVA


SMONTAGGIO IMPIANTO ASCENSORE


LIFT SYSTEM DISASSEMBLY




PARCHEGGIO STAZIONE FERROVIARIA BRIGNOLE, GENOVA


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


UCI CINEMA GENOVA


MANUTENZIONE STRAORDINARIA SCALA MOBILE


EXTRAORDINARY MAINTENANCE ESCALATOR


VILLA MINISTERIALE, ERBIL, IRAQ


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


MONOBLOCCO SAN MARTINO


RIFACIMENTO TOTALE PARTE ELETTRONICA DUE IMPIANTI NOVANTA METRI DI CORSA


TOTAL REFURBISHMENT OF THE ELECTRONIC PART TWO SYSTEMS NINETY METERS OF STROKE



BANCO ALIMENTARE, GENOVA


SOSTITUZIONE PORTE TAGLIAFUOCO

REPLACEMENT OF FIRE RESISTANT DOORS




SAN GIULIANO, GENOVA


SMONTAGGIO IMPIANTO ASCENSORE


LIFT SYSTEM DISASSEMBLY





SEDE TECNISUB, GENOVA


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


IPERCOOP AQUILONE, GENOVA


SOSTITUZIONE CATENE TRASCINAMENTO TAPPETO MOBILE

REPLACEMENT OF DRIVING CHAINS OF THE MOBILE CARPET



TORRE PIACENTINI, GENOVA


SOSTITUZIONE FUNI DI TRAZIONE IMPIANTO CORSA 120 MT VELOCITA' 8 M/S


REPLACEMENT OF TRACTION ROPES STROKE SYSTEM 120 MT SPEED 8 M/S


CENTRO COMMERCIALE "LE SERRE", ALBENGA


MONTAGGIO DI TUTTI I NUOVI IMPIANTI A PROGETTO

INSTALLATION OF ALL NEW PROJECT SYSTEMS


OSPEDALE S.S. ANTONIO E BIAGIO, ALESSANDRIA


RIFACIMENTO TOTALE SEI ASCENSORI


TOTAL SIX LIFT REFURBISHMENT



NUOVO PUNTO VENDITA LIDL, BURMARRAD, MALTA

INSTALLAZIONE DUE NUOVI IMPIANTI

INSTALLAZIONE DUE TAPPETI MOBILI 20 METRI


INSTALLATION OF TWO NEW ELEVATORS
INSTALLATION OF TWO MOBILE CARPETS 20 METERS


CORSO GENOVA, LAVAGNA


SMONTAGGIO IMPIANTO ASCENSORE


LIFT SYSTEM DISASSEMBLY




NUOVO PUNTO VENDITA LIDL, SLIEMA, MALTA


INSTALLAZIONE DUE NUOVI IMPIANTI


INSTALLATION OF TWO NEW ELEVATORS





COOP CORSO GASTALDI, GENOVA


SOSTITUZIONE CATENE TRASCINAMENTO TAPPETO MOBILE


REPLACEMENT OF DRIVING CHAINS OF THE MOBILE CARPET


PAGGI, SESTRI LEVANTE


SMONTAGGIO IMPIANTO ASCENSORE


LIFT SYSTEM DISASSEMBLY




BANCA CA.RI.GE GENOVA


SOSTITUZIONE QUADRO DI MANOVRA E PARTI MECCANICHE

REPLACEMENT OF THE CONTROL PANEL AND MECHANICAL PARTS


ESSELUNGA, LA SPEZIA


SOSTITUZIONE CATENE TRASCINAMENTO TAPPETI MOBILI

REPLACEMENT OF DRIVING CHAINS OF THE MOBILE CARPET



COSTA FASCINOSA, BARCELLONA


SERVICE IN NAVIGAZIONE

SERVICE AT SEA


PALEOCAPA 5, SAVONA


SOSTITUZIONE QUADRO DI MANOVRA E PARTI MECCANICHE

REPLACEMENT OF THE CONTROL PANEL AND MECHANICAL PARTS




EX SCOTTS MALTA


INSTALLAZIONE DUE NUOVI IMPIANTI 3000 KG


INSTALLATION OF TWO NEW PLANTS 3000 KG


PREFETTURA DI GENOVA

SMONTAGGIO IMPIANTO ASCENSORE

LIFT SYSTEM DISASSEMBLY